An inductance L and a resistance R are first connected to a battery. After some time the battery is disconnected but L and R remain connected in a closed circuit. Then the current reduces to 37% of its initial value in time ?

1. RL sec

2. RLsec

3. LRsec

4. 1LRsec

Subtopic:  LR circuit |
 78%
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints

In an LR-circuit, the time constant is that time in which current grows from zero to the value (where I0 is the steady-state current) 

1. 0.63 I0

2. 0.50 I0

3. 0.37 I0

4. I0

Subtopic:  LR circuit |
 76%
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints

In the figure magnetic energy stored in the coil is 

1. Zero

2. Infinite

3. 25 joules

4. None of the above

Subtopic:  Self - Inductance |
 83%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

advertisementadvertisement

The core of a transformer is laminated to reduce energy losses due to  

1. Eddy currents

2. Hysteresis

3. Resistance in winding

4. None of these

Subtopic:  Transformer |
 82%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A step-down transformer is connected to 2400 volts line and 80 amperes of current is found to flow in output load. The ratio of the turns in primary and secondary coil is 20 : 1. If transformer efficiency is 100%, then the current flowing in primary coil will be 

1. 1600 A

2. 20 A

3. 4 A

4. 1.5 A

Subtopic:  Transformer |
 67%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A loss free transformer has 500 turns on its primary winding and 2500 in secondary. The meters of the secondary indicate 200 volts at 8 amperes under these conditions. The voltage and current in the primary is 

1. 100 V, 16 A

2. 40 V, 40 A

3. 160 V, 10 A

4. 80 V, 20 A

Subtopic:  Transformer |
 87%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

advertisementadvertisement

A transformer connected to 220 Volt line shows an output of 2 A at 11000 Volt. The efficiency is 100%. The current drawn from the line is:

1. 100 A

2. 200 A

3. 22 A

4. 11 A

Subtopic:  Transformer |
 85%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

A power transformer is used to step up an alternating e.m.f. of 220 V to 11 kV to transmit 4.4 kW of power. If the primary coil has 1000 turns, what is the current rating of the secondary ? Assume 100% efficiency for the transformer 

1. 4 A

2. 0.4 A

3. 0.04 A

4. 0.2 A

Subtopic:  Transformer |
 76%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

The primary winding of transformer has 500 turns whereas its secondary has 5000 turns. The primary is connected to an ac supply of 20 V, 50 Hz. The secondary will have an output of 

1. 200 V, 50 Hz

2. 2 V, 50 Hz

3. 200 V, 500 Hz

4. 2 V, 5 Hz

Subtopic:  Transformer |
 81%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch

advertisementadvertisement

A step-down transformer is connected to main supply 200V to operate a 6V, 30W bulb. The current in primary is 

1. 3 A

2. 1.5 A

3. 0.3 A

4. 0.15 A

Subtopic:  Transformer |
 77%
From NCERT
To view explanation, please take trial in the course.
NEET 2025 - Target Batch
Hints
To view explanation, please take trial in the course.
NEET 2025 - Target Batch